DATE
|
CLIENT
|
WORKING SCOPE
|
APPROX WEIGHT
|
1981
|
CHINA PETROLEUM CORP.
|
1000M3 FUEL OIL STORAGE TANK
|
1300T
|
1981
|
CHINA PETROLEUM CORP.
|
35000M3 FUEL OIL STORAGE TANK
|
800T
|
1985
|
CHUNG HUA STADIUM.
|
LIGHT POLE
|
120T
|
1986
|
SAJYRA NEDUCAL CO.
|
BOILER
CALORIFIER
VESSEL¡BTANK
|
90T
|
1987
|
TAIPEI STADIUM.
|
LIGHT POLE
|
140T
|
1988
|
IHI CO.
|
CRANE CARTRIDGE
|
120T
|
1989
|
IHI CO.
|
12000KVA CO-GEN PROJECT
STEEL STRUCTURE
BOILER CASING
DUCT¡AE.P.
COAL BUNKER
|
900T
|
1990
|
IHI CO.
|
ERTCTION WORK OF 12000KVA
CO-GEN PLANT
|
1400T
|
1991
|
MITSUI CO.
|
15000KVA CO-GEN PROJECT
STEEL STRUCTURE
BOILER CASING
DUCT¡AE.P.
COAL BUNKER
|
950T
|
1992
|
CARRIER CO.
|
STAINLESS ICE STORAGE TANK
|
150T |
1993
|
TA TE CO.
|
STEEL STRUCTURE
|
1200T |
1994
|
CARRIER CO.
|
STAINLESS ICE STORAGE TANK
|
180T |
1995
|
MHI CO.
|
15000KVA CO-GEN PROJECT
DUCT¡AE.P.
COAL BUNKER
FIUEL OIL STORAGE TANK
WATER STORAGE TANK
|
500T |
1996
|
CHINA PETROLEUM CO.
|
30M3 DOUBLE WALL
FUEL TANK 59 SETS
|
470T |
1996 |
MHI CO.
|
BOILER CASING
|
60T |
1996 |
CHENG KUNG UNIVERSITY.
|
CRANE CARTRIDGE
|
80T |
1996
|
MITSUI CO.
|
J.B CRANE
|
60T |
1997
|
MHI CO. |
INCINERATOR PROJECT(°ª¶¯)
BOILER CASING
CHARGING HOPPER
|
800T |
1997
|
NIIGATA CO.
|
DE-NOX REATOR
|
30T |
1998
|
MHI CO.
|
INCINERATOR PROJECT(¤¯ªZ)
BOILER CASING
CHARGING HOPPER
OIL TANK
VESSEL
|
500T |
1998
|
FORMOSA GROUP(³Á¼d)
|
60M3 VESSEL 20 SETS ASME STAMP
|
300T |
1998
|
NIIGATA CO.
|
DE-NOX REACTOR
|
35T |
1999
|
TAIPEI IRON WORKS CO.
|
WASTE HEAT RECOVERY BOILER
|
200T |
2000
|
NIIGATA CO.
|
DE-NOX REACTOR
|
35T |
2000
|
·s®õ¦ù»É¤½¥q
|
STAINLESS TANK
|
60T |
2000
|
MORITANI CO. (YONDEN)
|
SILO
HOPPER
CONVEYOR
|
400T |
DATE
|
OWNER
|
CLIENT
|
WORKING SCOPE
|
|
T.P.C.
Taichung Fossil
Power Project
Unit 9, 10
|
Thermal
Engineering
International
¡]U.S.A.¡^
(Top Prime Co.)
|
1 |
550MW CONDENSER
|
2 Sets |
2 |
No.1
|
Low Press. Feed Water Heater Heating Surface¡G1113.1 M2 |
2 Sets |
3 |
No.2
|
Low Press. Feed Water Heater Heating Surface¡G1158.3 M2 |
2 Sets |
4 |
No.3
|
Low Press. Feed Water Heater Heating Surface¡G1156 M2 |
2 Sets |
5 |
No.4
|
Low Press. Feed Water Heater Heating Surface¡G1199 M2 |
2 Sets |
|
T.P.C.
Hsinta
Power Station
Unit 3, 4
F.G.D. Project
|
Yonden Engineering
Co., Inc.
¡]Japan¡^ |
10 Sets of Conveyor for F.G.D. System
|
|
Chang Chun
Petrochemical
Co., Ltd
|
MITSUBISHI
HEAVY
INDUSTRIES
LTD. |
ELECTROSTATIC PRECIPITATOR
|
|
Taichung Wu-Jih
Refuse Resource
Resource
Recovery
Plant
|
MITSUBISHI
HEAVY
INDUSTRIES
LTD. |
1.Under Grate Hopper
2.Sifiting Discharge Duct
3.FD Damper Air Control System
4.Ash Pit
5.Transition Piece Liner Chute
6.Ash Extractor
|
|
T.P.C.
Peng Hu
Chien-Shan
Power Station
Unit No.1- 4 |
¦æ¬F°|
°êx°h°£§Ð©x§L
»²¾É©eû·|
¥x¥_ÅK¤u¼t |
WASTE HEAT BOILER 4 Sets¡@
|
|
T.P.C.
Peng Hu
Chien-Shan
Power Station
Unit No.5- 12 |
TATUNG CO.
¤j¦P¤½¥q
|
WASTE HEAT BOILER 4 Sets¡@
|
|
T.P.C.
Peng Hu
Chien-Shan
Power Station
Unit No.5- 8 |
TATUNG CO.
¤j¦P¤½¥q
|
WASTE HEAT BOILER 4 Sets¡@
|
2001
I
2002 |
©_¬ü¥ø·~
Unit No.9- 10 |
¤ô¬ü¤uµ{¥ø·~
ªÑ¥÷¦³¤½¥q
|
18¾·¼o¼öÁçÄl
Air Receiver 8 Sets ¡@
|
2002 |
T.P.C.
Taichung Fossil
Power Project
Unit 9, 10
|
I H I (Japan)
Ishikawajima
Harima Heavy
Industries Co., Ltd |
Air Receiver 8 Sets
|
2002 |
T.P.C.
Taichung Fossil
Power Project
Unit 9, 10
|
DEMECH
Deccan Mechanical
& Chemical
Industries Co., Ltd
(Top Prime Co.)
|
Collecting tank
Pipe supports
Auxiliary tanks
Fly ash silo
|
2003
I
2004 |
Refuse Resource
Recover
Plant
|
MITSUBIHI
HEAVY
INDUSTRIES
|
VESSEL
HOPPER
TANK
BOILER CASING
CHARGING HOPPER
UNDER GRATE HOPPER
|
2002
|
N.S.R.R.C.
|
AIR
LIQUIDE |
100 M3 VESSEL ¡Ñ 20K ¡Ñ 2 SETS
ASME STAMP |
2003
|
N.S.R.R.C.
|
N.S.R.R.C. |
100 M3 VESSEL ¡Ñ 20K ¡Ñ 2 SETS
ASME STAMP |
2003
I
2004 |
101 Tower |
¹©¶¶¤uµ{¤½¥q
|
HYDRANT WATER STORAGE TANK
5.8 M3 ¡Ñ 1 set
10.2 M3 ¡Ñ 1 set
14.3 M3 ¡Ñ 1 set
37.9 M3 ¡Ñ 1 set
40.8 M3 ¡Ñ 1 set
70.2 M3 ¡Ñ 1 set
72.5 M3 ¡Ñ 4 set
36.5 M3 ¡Ñ 2 set
78.8 M3 ¡Ñ 1 set
137.7 M3 ¡Ñ 1 set
|
2003
|
¿«¦t±m´¹
|
º~ð¤uµ{
|
30M3 ¤£ù׿ûÀx¼Ñ6®y
10M3 ¤£ù׿ûÀx¼Ñ4®y
|
2004
|
µØ¬M¹q¤l
|
¶}¥ß¤uµ{
|
200M3 ¤£ù׿ûÀx¼Ñ1®y
100M3 ¤£ù׿ûÀx¼Ñ1®y |
2004
|
¦N©÷«¤u
|
|
360M3 ¥[²¸Åø1®y
|
2004
|
Àç«Ø¸p
|
ºa¹q¤uµ{¤½¥q
|
»ñ¤s·Ë¦Ã¤ô³B²z¼t
¹½®ñ¨t²Î¤uµ{
|
2004
|
Àç«Ø¸p
|
ºa¹q¤uµ{¤½¥q
|
»ñ¤s·Ë¦Ã¤ô³B²z¼t
¤G¨H¦À¤uµ{
|
2004
|
Àç«Ø¸p
|
ºa¹q¤uµ{¤½¥q
|
»ñ¤s·Ë¦Ã¤ô³B²z¼t
¤G¨H¦À¤uµ{
|
2005
|
¤Í¹F¥ú¹q
|
º~ð¤uµ{
|
100M3 ¤£ù׿ûÀx¼Ñ2®y
90M3 Àxªo¼Ñ |
2005
|
µÒ°s¤½¥q
|
¦Ë«n°à°s¼t
|
15¾·¤ôºÞÁçÄl
|
2005
|
¥x¶ì
|
Àº¨¹°ê»Ú
|
¥x¶ì¤¯ªZ¼t¤¯ÆP¥|´ÁÂX«Ø±í¼Ñ18®y
|
2005
|
¥x¶ì³Á¼d
|
THERMOKIMICA
|
45.6M3/H ²æ®ñ¼Ñ
ASME U STAMP |
2005
|
¥x¶ì³Á¼d
|
THERMOKIMICA
|
460M3/H ²æ®ñ¼Ñ
ASME U STAMP |